LocationLiverpool, Sydney, Australia
ClientLiverpool City Council
Scope670 metres of 2500mm diameter TBM pipe jack
Duration12 months
The tunnel alignment fell within a congested urban centre with multiple existing services, road and rail crossings. Nine metre deep soldier piled and spraycrete pits were constructed and the tunnel was excavated through rock.