Project
Details
LocationBrisbane, Queensland, Australia
Client Beavis and Bartel
ScopeConstruction of a 1500mm diameter, 600m tunnel drive from the Queens Wharf development through to the existing S1 sewer under the Turbot Streeet ramp at North Quay.
Duration4 Months
Another successful project from Bothar’s Australian operational team on the Queens Wharf Project, Brisbane. 600m x DN1400 GRP double curve gravity sewer with our AVN1200.