LocationBrisbane, Australia
ClientOrigin Alliance
ScopeBothar built TBM installation of 506m of 2800mm diameter
Duration9 months
Bothar built TBM installation of 506m of 2800mm diameter flood relief tunnel including deep shafts by soldier and sheet piled methods and marine recovery from the Brisbane River.